Roofing estimating for general contractors and subcontractors on hard-bid and negotiated work
We turn roof plans and roof elevations into bid-ready roofing cost estimates - material, labor, and equipment quantified for new construction, reroofing, and roof replacement work.
Estimate Ticket
Sample layout · figures populated per project
Scope
Roofing quantity takeoff
Roof area
- sq
Slope
Per plans
System
Per spec
Turnaround
24–72h
24–72h
Typical turnaround on roofing takeoff services
±2–3%
Target variance on roofing quantity takeoff
14+
Roof systems estimated, low-slope to steep-slope
100%
Estimates delivered with marked-up roof plans
Service Overview
Roofing estimating for general contractors and subcontractors on hard-bid and negotiated work
Roofing estimating for roofing contractors, scoped to real roof slopes and areas
Low-slope, steep-slope, metal, shingle, tile, and single-ply roofing estimating in one shop
Outsourced roofing estimating services that flex up during bid season, down when you're quiet
Services
Order a single takeoff or the complete roofing cost estimate - material through labor.
FEATURED
Complete roofing quantity takeoff - roof area calculation, roof square calculation, and roof slope calculation - pulled from architectural drawings and roof plans, low-slope or steep-slope.
02
Material, labor, and equipment combined into a single roofing cost estimate, priced against current membrane and shingle costs.
03
Roofing membrane, insulation, underlayment, and fastener quantities itemized by roof area.
04
Built-up, modified bitumen, TPO, EPDM, and PVC roofing estimating for low-slope commercial roofs.
05
Shingle, metal, tile, and slate roofing estimating for pitched roof and steep-slope residential work.
06
Roofing demolition estimate and roof replacement cost estimate, sequenced against tear-off and re-cover scope.
Process
The same five-stage process behind every roofing cost estimate we deliver, sized to project scale.
STAGE 01
We review architectural drawings, roof plans, roof elevations, and roofing specifications, noting slopes, penetrations, and roof system type before takeoff begins.
STAGE 02
Roof area calculation and roof square calculation across eaves and ridges, valleys and hips, with penetrations deducted per roof section.
STAGE 03
Membrane, insulation, and underlayment takeoff alongside flashing quantity takeoff, ridge cap takeoff, and gutter and downspout takeoff.
STAGE 04
Roofing material cost estimate and roofing labor cost estimate built alongside roofing equipment cost estimate and a stated roofing waste calculation.
STAGE 05
A second estimator checks quantities against marked-up roof plans before you receive a bid-ready roofing estimate summary with assumptions and exclusions.
Project types
Roof systems and cost drivers shift by building type - our takeoffs account for that from the first pass.
What's included
No stripped-down square-footage number - you get the backup that lets you defend the bid.
Membrane, shingle, tile, or metal panel quantities priced by roof area.
Typical roof assembly
Every layer counted by roof section - membrane through flashing - so material and labor stay tied to the same assembly.
Built-up, modified bitumen, TPO, EPDM, or PVC
Roof insulation takeoff, vapor barrier takeoff
Roofing underlayment takeoff by roof section
Roof fastener takeoff, deck condition notes
Ridge cap, roof curb, and flashing quantity takeoff
Recent estimate types
Representative snapshots showing the range of roofing takeoffs we handle. Figures shown are illustrative.
Warehouse / Low-slope
Single-ply roofing estimating across a large low-slope roof, with roof drain quantity takeoff, roof curb takeoff, and a full roofing waste calculation.
Multifamily / Steep-slope
Shingle quantity takeoff and roof replacement cost estimate across multiple pitched roof buildings.
Office / Metal
Metal roof panel takeoff with ridge cap and flashing quantity takeoff for a new construction roofing estimate.
Why us
Fast-turnaround roofing estimates without shortening the takeoff - most jobs move in 24–72 hours.
Low-slope and steep-slope roofing estimating handled together, so mixed-roof projects don't get split across vendors.
Material, labor, equipment, and waste separated line by line, not bundled into one square-foot number.
Every roofing quantity takeoff is checked against marked-up roof plans before it reaches your desk.
Outsource roofing estimating for one project or your entire pipeline during peak bid season.
Every estimate states roofing procurement notes and assumptions and exclusions up front - no surprises at award.
Who we help
Ready to Bid?
Send your roof plans and get back a professional roofing estimating services package - material, labor, and equipment, priced and ready to bid.
Yes. Roofing takeoff from PDF plans is our most common intake format, alongside CAD files and scanned roof plans.
Most projects turn around in 24–72 hours depending on roof area and system complexity. Larger projects are quoted with a set delivery date up front.