Built for a DOB review, not just a first read

Mechanical estimates that survive a DOB review, not just a first read of the drawings

Estimating Buddies prices HVAC, ductwork and piping scope for contractors working across New York - from a steam-to-hydronic conversion on the Upper West Side to a rooftop mechanical package in downtown Buffalo - with NYC Mechanical Code, Local Law 97 and filing requirements built into the number from the start.

ManhattanBrooklynQueensBronxStaten IslandUpstate NY

Mechanical Takeoff / HVAC

REF: NY-MECH-01

Bid Ready
01

RTU

Rooftop unit

02

VRF

VRF systems

03

AHU

Air handlers

04

RISER

Vertical risers

05

STEAM

Steam-to-hydronic

06

DUCT

Sheet-metal ductwork

Manhattan · Brooklyn · Buffalo · Scale: NTS

Five boroughs

NYC coverage

Upstate NY

Buffalo to Albany

NYC Mechanical Code

Built into the number

Local Law 97

Flagged in the estimate

What We Offer

Full mechanical estimating support, sized to a New York bid

Whether it's a co-op board package that needs a defensible number before a vote, or a general contractor's bid due at 3pm, our estimating work covers the full mechanical scope from first sketch to final quantity.

01

Mechanical cost estimating New York

Full mechanical cost estimates covering labor, equipment and materials for bid, budget or change-order pricing on New York projects.

02

Mechanical quantity takeoffs New York

Line-by-line takeoffs for ductwork, piping, insulation and fittings, extracted from the drawing set with markups you can check against the plans.

03

HVAC estimating New York

Rooftop units, VRF systems, air handlers and risers priced against current New York City and upstate labor and equipment costs.

04

Ductwork & sheet metal takeoffs New York

Rectangular, round and riser ductwork takeoffs with gauge, insulation and fitting counts your sheet metal shop can price directly from.

05

Piping & hydronic estimating New York

Steam, hydronic and refrigerant piping takeoffs, including conversions common in pre-war and older New York building stock.

06

Bid preparation support New York

Bid-day summary sheets and exclusion lists formatted for your proposal, so estimating never becomes the bottleneck at submission time.

07

MEP estimating coordination New York

Mechanical numbers coordinated with electrical and plumbing scope splits on negotiated and design-build New York projects.

08

Subcontractor estimating services New York

Standing estimating support for mechanical and HVAC subcontractors who need extra hands during heavy bidding stretches.

09

Construction bid estimating New York

Broader construction bid estimating support where mechanical is the largest single cost driver on the proposal.

Who We Serve

Written for whoever actually has to defend the number

A general contractor bidding a Midtown tenant fit-out and a co-op board approving a boiler replacement need very different things from the same estimate. We adjust the deliverable to match.

ID-01 · GC

General contractors

Mechanical numbers formatted to drop straight into your overall construction cost estimate, with plain-language clarifications for a GC audience.

ID-02 · SUB

HVAC & mechanical subcontractors

Detailed takeoffs and labor-hour breakdowns your own team can price against your rates during high-volume bidding weeks.

ID-03 · MEP

MEP contractors

Coordinated mechanical, plumbing and controls quantities for design-build and negotiated projects where scopes need to line up.

ID-04 · BOARD

Property managers & co-op/condo boards

Independent, defensible mechanical cost estimates for capital projects like boiler and cooling tower replacements, ready for board review.

ID-05 · OWNER

Owners & developers

Budget-level mechanical estimates for feasibility studies, financing packages and early value-engineering decisions.

ID-06 · DESIGN

Architects & engineers

Realistic mechanical cost ranges during design development, checked against current New York pricing rather than a national average.

Project Types

Every mechanical scope, floor by floor

New York mechanical work ranges from a single apartment gut renovation to a full high-rise mechanical replacement - the level of detail in the estimate is sized to match.

RESIDENTIAL

Residential

Apartment, co-op, condo and multifamily mechanical estimating covering split systems, PTAC replacement and ductwork.

Apartment renovations, co-op buildings, multifamily new construction

COMMERCIAL

Commercial

Office, retail and hospitality mechanical estimates covering VAV systems, rooftop units and tenant fit-out HVAC.

Office towers, tenant build-outs, hotels, retail

INDUSTRIAL

Industrial

Warehouse and light-industrial mechanical takeoffs covering ventilation and process piping systems.

Distribution centers, industrial buildings, plants

INSTITUTIONAL

Institutional

School, healthcare and municipal mechanical estimates shaped by ventilation and redundancy code requirements.

Schools, hospitals, city and state buildings

Landmarked buildings, mixed-use towers and historic pre-war conversions come with their own quirks - send the drawings and we'll flag anything that changes the scope.

What's Included in the Estimate

What's actually inside the number

Every estimate is built line by line from your drawings, then priced against current New York material and labor data.

Labor cost breakdown

Labor hours by task and trade, priced against current New York market labor rates, including prevailing wage projects where required.

Material quantities & pricing

Ductwork, piping, insulation and fittings quantified and priced against current supplier costs.

Equipment schedules

Boilers, chillers, cooling towers, air handlers and pumps pulled from the schedule and cross-checked against the plans.

Ductwork & riser quantities

Linear and square footage of ductwork by size and gauge, including vertical riser shafts common in high-rise buildings.

Piping & valve takeoffs

Steam, hydronic and refrigerant piping lengths with valve, fitting and insulation quantities by size.

Local Law 97 & energy code notes

Line items flagged where equipment efficiency, electrification or emissions provisions affect the mechanical scope.

Scope clarifications & exclusions

A plain-language list of what's priced and what isn't, so nothing gets assumed into the number.

Sample Estimate

What a mechanical estimate looks like on paper

A simplified excerpt from a New York multifamily mechanical estimate, shown to illustrate format. Figures are illustrative only and don't reflect any specific project or current pricing.

EB · Estimate summary

SAMPLE - MULTIFAMILY BOILER REPLACEMENT, NY

Not for bid use

Line item

System

Qty

Unit

Est. cost

Condensing boilers, 2,000 MBH

HVAC equipment

2

EA

$-

Hydronic piping, 2"-4"

Piping

1,180

LF

$-

Riser insulation & jacketing

Insulation

1 LOT

-

$-

Circulator pumps & controls

Controls / HVAC

4

EA

$-

DOB filing & permit coordination allowance

Admin

1 LOT

-

$-

Field labor, install & commissioning

Labor

1 LOT

-

$-

Estimated mechanical scope total

$-

Full estimates include quantity backup, marked-up drawings and current New York material and labor pricing - request a sample matched to your project type below.

Deliverables

Everything that ships with the final number

Files formatted to attach to a submission, not a draft you still have to rework before bid day.

01

Cost breakdown sheet

Excel or PDF, broken out by system, trade and cost category.

XLSX

02

Marked-up takeoff drawings

Color-coded PDF, PlanSwift or Bluebeam markups tied to every quantity.

PDF

03

Quantity summary sheets

Sortable quantity lists by material and size for bidding and ordering.

LIST

04

Bid-ready proposal numbers

Formatted to drop straight into your bid or board package.

READY

05

Scope & exclusion notes

Assumptions and exclusions to attach to your submission.

NOTES

06

Revision window

A defined window to fold in addenda without a full re-estimate.

ADDENDA

How the Process Works

Six stops from plan set to priced estimate

The same six steps whether it's a steam-to-hydronic conversion on the Upper West Side or a rooftop mechanical package in downtown Buffalo.

01

Send plans

Upload drawings, specs and the bid form.

02

Scope review

We confirm scope, gaps and turnaround.

03

Takeoff

Quantities measured sheet by sheet.

04

Pricing

Quantities priced with current NY data.

05

QA review

A second pass checks it against the plans.

06

Delivery

Estimate delivered ahead of your deadline.

Software & Pricing Sources

Built on tools your team already trusts

Takeoffs are performed digitally, and pricing is checked against current New York supplier and labor data rather than a flat national average.

PlanSwift

Digital quantity takeoff from PDF drawing sets

Bluebeam Revu

Markup, measurement, and addenda tracking

On-Screen Takeoff

On-screen quantity takeoff matched to drawing scale

Excel / Google Sheets

Editable cost breakdowns and quantity lists

Current supplier & distributor quotes

Equipment and material costs checked against current New York supplier and distributor pricing rather than a reused catalog figure.

Regional labor rate benchmarks

Installation labor priced against New York City and upstate labor markets, including prevailing wage projects where required.

RSMeans cost data cross-checks

Industry-standard cost data used as a baseline, then adjusted to current New York labor and material conditions.

Manufacturer equipment data

Boilers, chillers, air handlers and pumps cross-checked against manufacturer schedules and specified models.

Accuracy & Quality Review

Checked against the rules that actually govern New York mechanical work

Code awareness and a second estimator pass are built into the estimate, not added as a last-minute check.

01 - NYC Mechanical Code awareness

Ventilation rates and equipment sizing checked against the NYC Construction Codes and NYC Energy Conservation Code.

02 - Local Law 97 considerations

Equipment efficiency and electrification requirements flagged where Local Law 97 emissions limits affect mechanical system choices.

03 - DOB & FDNY filing awareness

Scope items noted where DOB permit filings or FDNY sign-off typically apply to the mechanical work involved.

04 - Second-estimator review

Every estimate is reviewed against the original drawings by a second set of eyes before release.

05 - Traceable quantities

Every number in the summary traces back to a marked-up sheet, so questions have a clear, checkable answer.

Why Choose Us

What matters when your name is on the bid

Local pricing, confirmed turnaround, and a number you can defend - built around how contractors actually bid in New York.

01

New York market knowledge

Pricing and code awareness built around New York City and upstate labor markets, not a generic national average.

02

Deadlines set upfront

Turnaround confirmed at scope review, before the takeoff starts, so it fits the bid date you're working against.

03

Transparent pricing

A clear, upfront quote based on scope and complexity, with no surprise charges once the takeoff begins.

04

Confidential by default

Plans and bid documents are used only to complete your estimate and treated as confidential throughout.

05

Direct estimator contact

Questions about the takeoff go to the person who built it, not a rotating support queue.

Service Areas

All five boroughs, plus upstate New York

Estimating is done entirely from plans, so there's no site-visit requirement - we serve contractors across New York City and upstate from the same digital takeoff process.

1

Manhattan

2

Brooklyn

3

Queens

4

The Bronx

5

Staten Island

Buffalo
Rochester
Albany
Syracuse
Yonkers
New Rochelle
Mount Vernon
White Plains

Reviewed for NY Code Awareness

Priced against New York code, not a national default

NYC Mechanical Code · NYC Energy Conservation Code · Local Law 97 · DOB & FDNY filing coordination

NY-01

NYC Mechanical Code

Ventilation rates and equipment sizing checked against the NYC Construction Codes for the mechanical work involved.

NY-02

NYC Energy Conservation Code

Equipment efficiency, insulation and system choices reviewed against the energy code that applies to New York City projects.

NY-03

Local Law 97

Equipment efficiency and electrification requirements flagged where Local Law 97 emissions limits affect mechanical system choices.

NY-04

DOB & FDNY filing coordination

Scope items noted where DOB permit filings or FDNY sign-off typically apply to the mechanical work involved.

Cost & Pricing Factors

What actually shapes the price of the estimate

Every quote is based on your actual plan set and deadline - send the drawings over and we'll price the estimate itself before any takeoff work begins.

01

Project size & square footage

Larger buildings mean more ductwork, piping and equipment to quantify.

02

System complexity

A basic package-unit layout takes far less time than a VAV system with full controls integration.

03

Filing & compliance scope

Projects requiring DOB filing coordination or Local Law 97 review typically take more time to estimate.

04

Drawing completeness

Full construction documents move faster than preliminary sets needing clarification first.

Send your drawings for a no-obligation quote before work begins.

Get a no-obligation quote

Start Your Mechanical Estimate

Get a no-obligation quote

Upload your mechanical drawings and specifications through the form. Our team reviews the scope and follows up with a quote and turnaround time for your New York project.

  • Trade-level material and labor split by system
  • Editable Excel report you can adjust and reuse
  • Marked-up mechanical plans showing every measurement
  • Five boroughs and upstate coverage from digital drawings

Before you send over your plans

Frequently asked questions about mechanical estimating services in New York.

It reviews your drawings and specs to quantify and price HVAC, ductwork, piping, insulation, fittings and equipment. Estimating Buddies produces full mechanical cost estimates covering labor, equipment and materials for bid, budget or change-order pricing, plus line-by-line takeoffs and bid-day summary sheets formatted for your proposal.

Turnaround is confirmed at scope review, before the takeoff starts, so it fits the bid date you're working against. Timeline depends on project size, system complexity and how complete the drawing set is. Every estimate is delivered ahead of your deadline.